Home › Our Work
Buildings we have been inside.
Hospitals mid-shift, factories mid-run, hotels mid-service. Filter by sector or service — or read the long version.
The Acute Medical Unit at Royal Blackburn Teaching Hospital is one of the North West’s busiest A&E departments. The existing bed lift was at the end of its life, and there was no version of this job where the unit closed.
We phased the installation around ward activity, worked nights where the corridor had to be clear by morning, and kept a single project manager on site throughout. Handover included the LOLER thorough examination and full documentation on day one of service.
A working food factory in Greater Manchester where goods lifts are part of the production line. When one stops, the line behind it stops with it.
Planned visits scheduled around shift patterns, a fully stocked workshop of spares for older equipment, and a 4-hour repair response as standard. Through the pandemic the contract ran uninterrupted while the site stayed operational.
A flagship showroom where the escalators are in full view of every customer who walks in. Downtime is not an inconvenience, it is a brand problem.
Six escalators and two lifts under one contract, serviced outside trading hours, with ride-quality and step-chain work prioritised over minimum compliance. Reporting goes to the dealer principal in language that is not engineering shorthand.
Finished work, no styling tricks.
Your building next.
Probably.
Ask us for references in your sector. We will give you buildings you can go and stand in.