Industrial Lifts & Heavy-Duty Goods Elevators

Heavy-duty, high-capacity vertical transport engineered for warehouses, manufacturing plants, distribution centres, and multi-tier logistics facilities. Designed to withstand demanding industrial environments with rated capacities up to 10,000kg, 24/7 reactive emergency repair support, and statutory LOLER compliance nationwide.

Goods lift capacity to
0 Kg
24/7
Cover available
Goods-only examination
0 mth
Visits a year available
0

Factories

|

Warehousing

|

Distribution

|

Pallet handling

|

PUWER

|

LOLER

Duty cycle decides everything

Robust, heavy-duty vertical transport built for non-stop logistics.

In high-output manufacturing plants, food processing facilities, e-commerce fulfilment hubs, and regional distribution centres, vertical transport is business-critical. Manual-handling bottlenecks, forklift delays, or an unexpected lift stoppage can immediately halt assembly lines, disrupt dispatch schedules, damage stock, and risk serious workplace injuries. When moving raw materials, palletised inventory, or heavy tooling across multiple mezzanine levels, industrial facilities require indestructible reliability.

Sheridan Lifts combines over 40 years of British engineering heritage with robust, heavy-duty lift technology. We design, manufacture, install, modernise, and maintain industrial lifts engineered to withstand punishment in harsh, demanding environments. Trusted by UK manufacturing giants including Kellogg’s, Crown Paints, and Park Cakes, we provide high-capacity hydraulic and traction goods lifts, accompanied freight elevators, and mezzanine platform solutions designed to optimise workflow, protect personnel, and maintain continuous productivity.

Lifts that suit industrial

Pallets, cages, forklifts, people.

Loading method matters as much as weight — how the load enters the car decides the door, the floor and the guides.

To 5,000 kg
Goods lifts

Heavy-duty lifts built around the load and the way it arrives. Reinforced floors, wide openings and door gear specified for constant trolley and pallet traffic.

To 3,000 kg
Goods passenger lifts

Where operators travel with the load. Rated for people as well as goods, which brings it onto the six-month examination interval.

Low rise · high load
Scissor & mezzanine lifts

Short-rise platforms serving mezzanines and loading docks where a full shaft is neither practical nor necessary.

01 / Downtime costs more than the lift

Maintenance timed to the shutdown.

On a production site an unplanned lift outage stops more than the lift. We schedule planned work into existing shutdown windows rather than creating new ones.

For sites running continuously, we hold the common wear parts for your specific equipment so a fault is a first-visit fix.

02 / Compliance on the floor

LOLER and PUWER both apply.

Lifting equipment on an industrial site sits under LOLER for thorough examination and PUWER for safe use, guarding and operator training.

Our reports are written to cover both, so the same document works for your health and safety file and your insurer.

For plant & operations managers

Intervals, loads and what changes them.

SL.IND / TECH
Intervals & capacities

Goods-only lifts

Every 6 months

LOLER 1998

Goods passenger lifts

Every 6 months

LOLER 1998

After exceptional circumstances

Before reuse

LOLER reg 9

Typical goods capacity

1,000–5,000 kg

By duty

High duty cycle schedule

12 visits a year

By usage

If people ever ride in a goods lift — including an operator travelling with a load — the six-month interval applies, regardless of what the lift was originally specified for.

Standards we work to
LOLER 1998

Thorough examination at statutory intervals, carried out and certified in house.

EN 81-20 / 81-50

Current lift safety standard for design and installation, with declaration of conformity at handover.

EN 81-70 / Part M

Accessibility — car dimensions, controls, signals and door dwell times.

EN 81-72

Firefighting lifts, including secondary supply and protected lobby requirements.

BS 7255

Safe working on lifts — the code of practice our engineers work to on every site.

ISO 14001 / 45001

Accredited environmental and occupational health and safety management systems.

Commercial projects

Distribution centre, Yorkshire
Gold · goods

Heavy-duty goods lift on continuous shift use, maintained on a twelve-visit schedule.

Manufacturing site, Lancashire
Full modernisation

Goods lift modernised in place, keeping the original shaft and structure to avoid a line stoppage.

Cold store, Greater Manchester
3,000 kg

Goods passenger lift specified for pallet loading in a temperature- controlled environment.

Warehouse mezzanine, Hertfordshire
Scissor lift

Short-rise platform serving a new mezzanine picking floor, installed over a weekend.

Tell us the journeys per shift.
Not the tonnage.

Duty cycle is what we need to specify the right lift and the right maintenance schedule for it.