Commercial Lifts for Offices, Retail & Public Buildings

High-capacity, energy-efficient vertical transport engineered for demanding commercial environments. From high-speed corporate passenger lifts and retail goods elevators to DDA platform lifts, Sheridan Lifts delivers bespoke design, turnkey installation, 24/7 reactive repairs, and statutory LOLER compliance nationwide.

12-15%
Peak handling target
Entrapment response
0 hr
Statutory examination
0 mth
24/7
Cover available

Offices

|

Retail

|

Multi-tenant

|

Managing agents

|

Part M

|

EN 81-20

Traffic, not just transport

High-performance mobility engineered for business continuity.

In a commercial building the lift is judged twice a day, by everybody, at the same time. Waiting times at the morning peak shape how tenants feel about the whole building — and they are decided by capacity and control, not by finish.

We size lifts against real occupancy figures and we will tell you
when a building needs a second car rather than a faster one.

Lifts that suit commercial

Front of house and back of house.

Most commercial buildings need both, and the mistake is making one lift do both jobs.

25+ car sizes · 4–33 person
Passenger lifts

The main circulation lift. Sized on handling capacity at peak rather than headline speed, and finished to sit alongside the reception it opens into.

To 3,000 kg
Goods passenger lifts

Moves stock, deliveries and people in one shaft. Saves the floor area a second lift would cost and keeps trolleys out of the main lobby.

EN 81-72
Firefighting lifts

Required above certain building heights, with protected lobby, secondary power supply and dedicated controls tested on a set interval.

01 / For landlords

Downtime is a lettings problem.

An unreliable lift shows up in tenant satisfaction long before it shows up in the maintenance budget. It is one of the few building services every occupier notices daily.

We schedule planned work outside occupancy hours and phase multi-car
buildings so a lift is always running.

02 / For fit-out teams

The lift is on the critical path.

Controllers and car interiors are long-lead items. On refurbishments they are the thing most likely to hold up a handover date.

We order long-lead items before the lift comes out of service, and we work to the programme rather than around it.

For asset & facilities managers

What a commercial building is expected to hold.

SL.RES / TECH
Intervals & benchmarks

Passenger lifts

Every 6 months

LOLER 1998

Goods passenger lifts

Every 6 months

LOLER 1998

Firefighting lift test

Monthly

EN 81-72

Peak handling capacity

12–15% in 5 min

CIBSE D

Target waiting interval

25–30 seconds

Prime office

Service lifts in hospitality typically run several times the duty cycle of the guest lift. We recommend maintenance frequency by measured use rather than by lift type.

Standards we work to
LOLER 1998

Thorough examination at statutory intervals, carried out and certified in house.

EN 81-20 / 81-50

Current lift safety standard for design and installation, with declaration of conformity at handover.

EN 81-70 / Part M

Accessibility — car dimensions, controls, signals and door dwell times.

EN 81-72

Firefighting lifts, including secondary supply and protected lobby requirements.

BS 7255

Safe working on lifts — the code of practice our engineers work to on every site.

ISO 14001 / 45001

Accredited environmental and occupational health and safety management systems.

Commercial projects

City-centre office, Manchester
2 cars · full modernisation

Both passenger lifts modernised over eight weeks with one car in service throughout.

Retail unit, Trafford
Goods passenger

Goods passenger lift installed to move stock and staff without crossing the shop floor.

Multi-tenant building, St Albans
Silver contract

Maintenance contract taken over from the original installer across three passenger lifts.

Business park, Cheshire
Part M upgrade

Control panels, signalling and door timings brought up to Part M across four buildings.

Tell us the morning peak.
We will size it.

Occupancy, floor count and arrival pattern are enough for us to say whether your building is short of lift capacity.