New lift installation: Bayard Plaza, Peterborough

lounge at bayard plaza

A luxury housing development fronted by a gated entrance in the heart of Peterborough city centre is the site for one of our latest lift installation jobs. Our engineers have installed a 1000KG Kleemann traction firefighting lift here on site and are nearing project completion and handover. This is a passenger lift giving residents access […]

In Profile: Parliament Street, Liverpool

liverpool

Sheridan Lifts are carrying out separate lift installation works on the same site within the city of Liverpool. Firstly, we will be carrying out lift extension works on a job we initially carried out in 2018. This is an existing 7-stop lift which is being amended for our client Goodwin Construction following alterations to the […]

Part One: Sheridan Lifts in Chinatown

manchester chinatown

Sheridan Lifts are currently on site doing what we do best in Manchester’s eclectic Chinatown district. After being decimated by a devastating fire back in November 2016, not a great deal of hope was given to this Grade II listed building on Faulkner Street, which directly faces Manchester’s famous Chinatown arch. The building was completely […]

Lee Street Circle, Leicester

firefighters

Following advice from their building control team, our client in Leicester have decided to upgrade the passenger lift we installed for them in November 2018 to a firefighting lift. As you may know, in the event of a fire, it is not appropriate to use a lift whilst there is an increased risk of passengers becoming […]